Serviceportal Industrie

Power Plant Construction

Assembly Groups

Assembly Group BG57 MS41


Group

1102


view as PDF file

Application

An Assembly Group for the creation of guided supports for pipes without complex requirements and without heat insulation. As an alternative to U-bolts, this U-clamp is ideal for space-saving, direct assembly on the supporting structure. The slide plate reduces the friction between the pipe and supporting structure. A galvanic separation between the pipe and U-clamp and the supporting structure is achieved through the captive plastic linings and slide plate, meaning that VA pipes can also be secured, for example.

Scope of delivery

Each Assembly Group is pre-assembled, packed and labeled.

Parts list:
Item 1 U-Camp RUC I
Assembly Kit MKit MS RUC I consists of:
Item 2 Threaded Plate NT CC 41-M10
Item 3 U Washer US 10/125
Item 4 Hexagon Bolt SKT M10 x 25

Installation

The assembly of the individual components to form an Assembly Group is carried out during the course of pipe installation on the construction site.

Technical Data

Material:
Clamp body:
Steel, HCP
Lining and slide plate:
Thermoplastic resins
Area of use:
-20°C to +90°C (at lining and slide plate)
Type Nominal widths
[DN]
B
[mm]
W
[kg]
Quantity
[pack]
Part-
No.
27 15 134 0.34 1 114670
33 20 140 0.35 1 114671
40 25 147 0.38 1 114672
48 32 155 0.40 1 114673
55 40 161 0.42 1 114674
67 50 173 0.47 1 114675
83 65 189 0.54 1 114676
95 80 202 0.58 1 114677
121 100 227 0.67 1 114678